Annex 2. Additional Results for the Replication Exercise
Author | Maccaferri, Sara; Bellia, Mario |
Pages | 51-55 |
51
Annex 2. Additional Results for the Replication Exercise
The results reported in this Section replicate the event studies presented in Section 3.1 and are run using the
entire set of banks, without removing those belonging to the country where the given event took place.
Table 46: Abnor mal bank CDS spre ads difference s- creditor bail-in Denmar k – full dataset
Event
Date
Full
sample
G-SIB
Non-G-
SIB
G-SIB vs
Non-G-
SIB
GIIPS
Non
GIIPS
GIIPS vs
Non-
GIIPS
Amage rbanken: b ail-in of
se nior debt
06/02/11
Averag e
-1.18 7
2.606
-2.74 4
5.35**
-6.06 6
1.388
-7.45 4
T-tes t
-0.06 1
-0.42 0
-0.26 7
-4.03 1
-0.50 9
-0.19 2
-1.51 2
p-v alue
0.805
0.517
0.605
0.045
0.475
0.661
0.219
Cumula ted
ave rage
-4.77 7
-0.65 1
-6.46 9
5.818
-12.1 51
-0.88 5
-11.2 66
T-tes t
0.485
0.013
0.733
2.353
1.009
0.038
1.706
p-v alue
0.486
0.909
0.392
0.125
0.315
0.844
0.192
Table 47 : Abnor mal bank stock retur ns - creditor bail-in Denmark – full datas et
Event
Date
Full
sample
G-SIB
Non-G-
SIB
G-SIB vs
Non-G-
SIB
GIIPS
Non
GIIPS
GIIPS vs
Non-
GIIPS
Amage rbanken: b ail-in of
se nior debt
06/02/11
Averag e
0.741%
1.111%
0.654%
0.457%
0.056%
1.049%
-0.99 2%
T-tes t
-0.51 3
-0.58 6
-0.46 0
-0.38 3
-0.00 1
-2.00 9
-0.50 7
p-v alue
0.476
0.447
0.500
0.538
0.976
0.161
0.479
Cumula ted
ave rage
0.778%
1.271%
0.662%
0.609%
-0.00 9%
1.131%
-1.14 %
T-tes t
0.274
0.372
0.229
0.330
0.000
1.134
0.324
p-v alue
0.602
0.544
0.634
0.567
0.997
0.290
0.571
Table 48 : Abnor mal bank CDS spre ads difference s - creditor bail-in Spain – full datase t
Event
Date
Full
sample
G-SIB
Non-G-
SIB
G-SIB vs
Non-G-
SIB
GIIPS
Non
GIIPS
GIIPS vs
Non-
GIIPS
Sp anish bank re scue plan
implies ba il-in
10/07/12
Averag e
-0.54 8
-3.32 6
0.563
-3.88 9
0.186
-0.95 6
1.142
T-tes t
-0.00 6
-0.29 4
-0.00 5
-0.54 1
0.000
-0.05 3
-0.01 0
p-v alue
0.938
0.588
0.943
0.462
0.989
0.819
0.921
Cumula ted
ave rage
-0.76 5
-2.67 6
0
-2.67 6
0.991
-1.74
2.731
T-tes t
0.006
0.094
0.000
0.126
0.003
0.086
0.028
p-v alue
0.939
0.759
1.000
0.722
0.960
0.769
0.867
German go vernment
ba cks rescu e plan
19/07/12
Averag e
-1.90 7
-0.32 6
-2.53 9
2.213
-3.51 1
-1.01 6
-2.49 5
T-tes t
-0.07 6
-0.00 3
-0.10 5
-0.17 1
-0.06 4
-0.06 5
-0.04 6
p-v alue
0.783
0.957
0.745
0.679
0.800
0.799
0.830
To continue reading
Request your trial