Ypothalassios Agogos Fysikou Aeriou Elladas – Italias – Poseidon AE (YAFA Poseidon) v European Climate, Infrastructure and Environment Executive Agency.

JurisdictionEuropean Union
CourtGeneral Court (European Union)
ECLIECLI:EU:T:2026:727
Docket NumberT-98/25
Date04 November 2026

JUDGMENT OF THE GENERAL COURT (Tenth Chamber)

4 November 2026 (*)

( Energy – Connecting Europe Facility – Regulation (EU, Euratom) No 347/2013 – Calls for proposals – Cross-border energy infrastructure projects – Proposal for the construction of a pipeline in the eastern Mediterranean Sea – Rejection of the proposal as inadmissible – Obligation to state reasons – Error of assessment – Right to be heard – Liability )

In Case T‑98/25,

Ypothalassios Agogos Fysikou Aeriou Elladas – Italias – Poseidon AE (YAFA Poseidon), established in Athens (Greece), represented by C. Cocuzza, F. Francica, T. Mambrini and C. Pasina, lawyers,

applicant,

v

European Climate, Infrastructure and Environment Executive Agency (CINEA), represented by I. Ramallo García-Pérez, N. Kopietz and V. Bard, acting as Agents, and by M. Troncoso Ferrer and L. Lence de Frutos, lawyers,

defendant,

THE GENERAL COURT (Tenth Chamber),

composed of S.L. Kalėda (Rapporteur), President, H. Kanninen and T. Perišin, Judges,

Registrar: S. Spyropoulos, Administrator,

having regard to the written part of the procedure,

further to the hearing on 21 April 2026,

gives the following

Judgment

1 By its action under Article 263 TFEU, the applicant, Ypothalassios Agogos Fysikou Aeriou Elladas – Italias – Poseidon AE (YAFA Poseidon), seeks, first, annulment of Decision Ares(2024) 8655163 of the European Climate, Infrastructure and Environment Executive Agency (CINEA) of 4 December 2024, by which CINEA rejected its proposal relating to the Connecting Europe Facility (CEF) (‘the contested decision’), and, second, compensation for the damage which it claims to have suffered as a result of the loss of an opportunity to be granted funds following the award procedure.

Background to the dispute

2 On 11 April 2024, CINEA launched a call for proposals ‘CEF 2 Energy – Projects of Common and Mutual Interest 2024’, bearing the reference CEF-E-2024-PCI-PMI (‘the call for proposals’). The objective of the call for proposals was to finance, under the CEF, studies or works contributing to the preparation of energy infrastructure for projects of common interest (‘PCIs’) and projects of mutual interest (‘PMIs’) which have significant socioeconomic benefits and ensure greater solidarity between Member States, but which do not receive adequate market financing. The closing date for the submission of proposals was set at 22 October 2024.

3 Paragraph 5 of the call for proposals, entitled ‘Admissibility and documents’, provided that ‘proposals [had to] be complete and contain all the requested information and all required annexes and supporting documents’, namely ‘Application Form Part A – contains administrative information about the participants … Application Form Part B – contains the technical description of the project … Mandatory annexes and supporting documents … Detailed budget table per [work package] – Annual activity reports … – Timetable … – Agreement by the concerned Member States (Letter of support) – Environmental compliance file – List of previous projects (key projects for the last 4 years) – … compliance form …’.

4 In addition, according to paragraph 5 of the call for proposals, for PCIs and PMIs falling within the categories referred to in Article 24 of Regulation (EU) 2022/869 of the European Parliament and of the Council of 30 May 2022 on guidelines for trans-European energy infrastructure, amending Regulations (EC) No 715/2009, (EU) 2019/942 and (EU) 2019/943 and Directives 2009/73/EC and (EU) 2019/944, and repealing Regulation (EU) No 347/2013 (OJ 2022 L 152, p. 45; ‘the 2022 TEN-E Regulation’), and in point 1(a) to (d) and (f) and point 3 of Annex II to that regulation, the following documents had to be submitted: first, a full project-specific cost-benefit analysis; second, a project-specific and legally valid cross-border cost allocation (CBCA) decision (‘the CBCA decision’), which, according to footnote 8 to the call for proposals, had to ‘be fully compliant with the requirements of Article 16 of the [2022] TEN-E Regulation and [had to] be still in force (i.e., not expired, cancelled or with ongoing appeals) and display evidence of consultation with other concerned Transmission System Operators and National Regulatory Authorities’, ‘applicants [taking into account] as appropriate the CBCA guidance that is already available, for instance the … Recommendation No 02/2023 [of the Agency for the Cooperation of Energy Regulators (ACER)] of 22 June 2023 on good practices for the treatment of the investment requests, including [CBCA] requests for PCIs …’; third, a ‘business plan and other assessments showing that the project cannot be financed by the market or through the regulatory framework’.

5 The pipeline project known as ‘EastMed’, which aims to connect Cyprus to the European gas network (‘the EastMed project’), is included in the EU list of PCIs, in accordance with the provisions of Regulation (EU) No 347/2013 of the European Parliament and of the Council of 17 April 2013 on guidelines for trans-European energy infrastructure and repealing Decision No 1364/2006/EC and amending Regulations (EC) No 713/2009, (EC) No 714/2009 and (EC) No 715/2009 (OJ 2013 L 115, p. 39; ‘the 2013 TEN-E Regulation’) and the 2022 TEN-E Regulation.

6 On 22 October 2024, the applicant submitted a proposal for financial support under the call for proposals (‘the proposal at issue’) relating to the EastMed project.

7 With its proposal, the applicant attached, as the CBCA decision, a document entitled ‘Coordinated decision on EastMed PCI Investment Request and on the [CBCA] by the Hellenic Regulatory Authority for Energy[,] Waste and Water, the Cyprus Energy Regulatory Authority and the Italian Regulatory Authority for Energy, [N]etworks and Environment’, signed by the national regulatory authorities (‘the NRAs’) concerned (‘the NRA decision’).

8 On 9 December 2024, by the contested decision, CINEA rejected the proposal at issue on the ground that it did not comply with the conditions of admissibility.

9 The contested decision states:

‘The proposal is inadmissible, as it is incomplete. The applicants submitted a document entitled “Coordinated decision on EastMed PCI Investment Request and on the [CBCA] by the Hellenic Regulatory Authority for Energy[,] Waste and Water, the Cyprus Energy Regulatory Authority and the Italian Regulatory Authority for Energy, [N]etworks and Environment”. The document was issued in October 2024 pursuant to [the 2013 TEN-E Regulation] applicable as regards the project at the time. Upon examination of this document, it has been found not to be in compliance with the requirements of Article 12 of [the 2013 TEN-E Regulation], since (i) no request for investment is addressed at least to the regulatory systems of the constructing countries, (ii) the principle of Union grants as last resort is not reflected, (iii) there is no clarity on the regulatory nature of the project leaving doubts whether the project would be eligible or not for such a decision, in particular, as regards tariff regulation, and (iv) the benefits of the project per Member State do not reflect its status under Article 24 of [the 2022 TEN-E Regulation], i.e. to secure the permanent connection of Cyprus to the trans-European gas market. Therefore, the proposal is considered incomplete and inadmissible because the document submitted is not compliant with the call requirements’.

Forms of order sought

10 The applicant claims that the Court should:

– annul the contested decision;

– order CINEA to admit the applicant to the evaluation and award procedure stage of the call for proposals and evaluate its submission in the light of the information provided therein, including all the facts, documents and evidence that have been clarified, and elaborated on, in the present proceedings;

– in the event that the applicant could not be admitted to the evaluation stage, or in the event that it is admitted and does not obtain financing, order CINEA to pay damages to the applicant for an amount equal to the funding sought in the submission, which was wrongfully denied;

– order CINEA to pay the costs.

11 CINEA contends that the Court should:

– dismiss the action as inadmissible or unfounded;

– order the applicant to pay the costs.

Law

The Court’s jurisdiction with regard to the applicant’s second head of claim

12 By its second head of claim, the applicant asks the Court, in essence, to order CINEA to declare the proposal at issue admissible and to carry out an evaluation of that proposal.

13 CINEA submits that the second head of claim contains a request for the Court to issue directions and must be rejected as inadmissible.

14 In that regard, it is sufficient to recall that, when exercising judicial review of legality under Article 263 TFEU, the Court has no jurisdiction to issue directions to the institutions, bodies, offices and agencies of the European Union (see order of 26 October 1995, Pevasa and Inpesca v Commission, C‑199/94 P and C‑200/94 P, EU:C:1995:360, paragraph 24 and the case-law cited).

15 Accordingly, in so far as the applicant’s second head of claim seeks that the Court issue directions to CINEA, that head of claim must be rejected on the ground of lack of jurisdiction.

The claim for annulment

16 In support of its claim for annulment, the applicant relies on three pleas in law, alleging, in essence, first, infringement of the obligation to state reasons, second, manifest error of assessment and, third, breach of the principle of good administration and of the right to be heard.

The applicable rules

17 As a preliminary point, it must be borne in mind that the 2013 TEN-E Regulation was repealed by the 2022 TEN-E Regulation with effect from 23 June 2022. However, according to Article 32(2) of the 2022 TEN-E Regulation, Articles 2 to 10 and 12 to 14 of, and Annexes I to IV and VI to, the 2013 TEN-E Regulation are to remain in force and produce effects as regards the...

Get this document and AI-powered insights with a free trial of vLex and Vincent AI

Get Started for Free

Unlock full access with a free 7-day trial

Transform your legal research with vLex

  • Complete access to the largest collection of common law case law on one platform

  • Generate AI case summaries that instantly highlight key legal issues

  • Advanced search capabilities with precise filtering and sorting options

  • Comprehensive legal content with documents across 100+ jurisdictions

  • Trusted by 2 million professionals including top global firms

  • Access AI-Powered Research with Vincent AI: Natural language queries with verified citations

vLex

Unlock full access with a free 7-day trial

Transform your legal research with vLex

  • Complete access to the largest collection of common law case law on one platform

  • Generate AI case summaries that instantly highlight key legal issues

  • Advanced search capabilities with precise filtering and sorting options

  • Comprehensive legal content with documents across 100+ jurisdictions

  • Trusted by 2 million professionals including top global firms

  • Access AI-Powered Research with Vincent AI: Natural language queries with verified citations

vLex

Unlock full access with a free 7-day trial

Transform your legal research with vLex

  • Complete access to the largest collection of common law case law on one platform

  • Generate AI case summaries that instantly highlight key legal issues

  • Advanced search capabilities with precise filtering and sorting options

  • Comprehensive legal content with documents across 100+ jurisdictions

  • Trusted by 2 million professionals including top global firms

  • Access AI-Powered Research with Vincent AI: Natural language queries with verified citations

vLex

Unlock full access with a free 7-day trial

Transform your legal research with vLex

  • Complete access to the largest collection of common law case law on one platform

  • Generate AI case summaries that instantly highlight key legal issues

  • Advanced search capabilities with precise filtering and sorting options

  • Comprehensive legal content with documents across 100+ jurisdictions

  • Trusted by 2 million professionals including top global firms

  • Access AI-Powered Research with Vincent AI: Natural language queries with verified citations

vLex

Unlock full access with a free 7-day trial

Transform your legal research with vLex

  • Complete access to the largest collection of common law case law on one platform

  • Generate AI case summaries that instantly highlight key legal issues

  • Advanced search capabilities with precise filtering and sorting options

  • Comprehensive legal content with documents across 100+ jurisdictions

  • Trusted by 2 million professionals including top global firms

  • Access AI-Powered Research with Vincent AI: Natural language queries with verified citations

vLex

Unlock full access with a free 7-day trial

Transform your legal research with vLex

  • Complete access to the largest collection of common law case law on one platform

  • Generate AI case summaries that instantly highlight key legal issues

  • Advanced search capabilities with precise filtering and sorting options

  • Comprehensive legal content with documents across 100+ jurisdictions

  • Trusted by 2 million professionals including top global firms

  • Access AI-Powered Research with Vincent AI: Natural language queries with verified citations

vLex