Methodological note

AuthorTornasi, Zeno; Iagher, Raluca; Delaney, Niamh
Pages11-12
11
0. METHODOLOGICAL NOTE
Data sources
Calls for proposa l: From the start of Horizon 2020 in 2014 until 2019, projects funded
under th e calls foreseen in the respective SwafS work programmes are included in the
analysis (note th at the call s dedicated to National Cont act Points and those man aged by
DG R&I, featuri ng under the ‘other actions’ s ection of the work programmes are
excluded):
Year
Call
2014
ISSI (1 topic): ISSI-5-2014; GARRI (1 topic): GARRI-1-2014
2015
ISSI (3 topics): ISSI-3-2015, ISSI-4-2015, ISSI-5-2015; GARRI (1
topic): GARRI-2-2015
2016
Single call (2 topics): SwafS-04-2016, SwafS-09-2016
2017
Single call (4 topics): SwafS-05-2017, SwafS-06-2017, SwafS-12-
2017, SwafS-14-2017
2018
Two-stage call (1 topic): SwafS-20-2018-2019; Single call (3
topics)18: SwafS-14-2018-2019-2020, SwafS-21-2018, SwafS-22-
2018
2019
Two-stage call (1 topic)19: SwafS-20-2018-2019; Single call (2
topics): SwafS-05-2018-2019, SwafS-14-2018-2019-2020
2020
Single call (2 topics)20: SwafS-14-2018-2019-2020, SwafS-31-2020
Projects: The projects included are those fun ded under the calls listed in Table 1: Number
of RRI projects in Horizon 2020, as of 15 /07/2020. In terms of data sourc es, the Grant Agreement
notably the Descrip tion of Action, project deliverables, review reports, project web sites,
project policy briefs as well as input from REA Project Officers over-seeing the
implementation of the projects have been the basis of the analysis.
Reports: Horizon 2020 legal basis, annual work programmes, Interim evaluation of
Horizon 2020, Impact Assessment for Horizon Europe are the primary references. Other
relevant documents are referenced directly in the respective chapters.
Feedback from the evaluation: Some recommendations made by experts during the
panel meetings and the independent observers in their reports are also incl uded.
DG R&I Pol icy Officers provided input in terms of key referen ce documents as well as
the objectives of the respective themes and gave feedback on the draft chapters.
18 Includes SwafS-22-2018 topic on Outermost Regions managed b y DG R&I
19 Grant Agreement Preparation on-going at the time of writing this report so these projects have not bee n included in the
report.
20 Evaluation still to be carried out at the time of writing this report .

To continue reading

Request your trial

VLEX uses login cookies to provide you with a better browsing experience. If you click on 'Accept' or continue browsing this site we consider that you accept our cookie policy. ACCEPT