Methodological note

AuthorTornasi, Zeno; Delaney, Niamh
Pages9-10
9
0. METHODOLOGICAL NOTE
Data sources
Calls for proposa l: From the start of Horizon 2020 in 2014 until 2019, projects funded
under th e calls foreseen in the respective SwafS work programmes are included in the
analysis (note th at the call s dedicated to National Cont act Points and those man aged by
DG R&I, featuri ng under the ‘other actions’ s ection of the work programmes are
excluded):
Year
Call
2014
SEAC (2 topics) : SEAC-1-2014, SEAC-2-2014
2015
SEAC (1 topic) : SEAC-1-2015
2016
Single call (1 topic): SwafS-15-2016
2017
Single call (1 topic): SwafS-11-2017
2018
Two-stage call (1 topic): SwafS-01-2018-2019-2020
2019
Two-stage call (1 topic)15: SwafS-01-2018-2019-2020
2020
Two-stage call (2 topics): SwafS-01-2018-2019-2020, SwafS-24-2020
Projects: The projects included are those fun ded under the calls listed in Table 1: Number
of Science Education projects in Horizon 2020, as of 15/07/2020. In terms of data sources, the Grant
Agreement notably the Description of Action, project deliverables, r eview reports, project
web sites, project policy briefs as well as i nput from REA Project Officers over-seeing the
implementation of the projects have been the basis of the analysis.
Cluster events: R EA-led events organised in collaboration with DG R&I, brin ging
together projects funded under the same theme, pointed to some recommendations
which are taken up in this report. In 2019, such an event was held for sci ence education
projects.
Reports: Horizon 2020 legal basis, annual work programmes, Interim evaluation of
Horizon 2020, Impact Assessment for Hori zon Europe ar e the p rimary references. Other
relevant documents are referenced directly in the report.
Feedback from the evaluation: Some recommendations made b y experts during the
panel meetings and the independent observers in their reports are also incl uded.
DG R&I Pol icy Officers provided input in terms of key referen ce documents as well as
the objectives of the respective themes and gave feedback on the draft chapters.
15 Grant Agreement Preparation on-going at the time of writing this report so these projects have not bee n included in the
report.